Been hustling all day to get this done. Only thing left needed to bolt it all up is I need a sleeve made for the stock axel. It has to be 15mm ID 25mm OD and 217mm long. If any machinist is reading this shoot me an offer on how much an aluminum or bronze sleeve would be.
Bearing puller I grab from the U S and A
Worked great got the bearings out

Then I tossed the bearings into the freezer
Chopped the swingarm down to the size of the frame. I removed 5mm from each size and tossed the spacer inside the dust covers. 222mm just like the FZR frame
This is the spacer inside the swingarm that keeps the inner bearing races from falling inside the swingarm. Cut it down by 4mm on each side and test fit with the races to make sure it was all good.
Put one of the bearings and inner races back in. Saving the other side to take to a machinist in case they need it. It's also in the freezer right now with the bearing.
Trimming rearset area
Sucks no machining can get done tommorow because then I could bolt it all back together and go ride it! Actually not really. I still have to confirm sprocket aligment. And then swap the sprocket out with a -1 ninja sprocket I have to regain alignment which I suspect I will have to. And then I have to get and rivet a chain, which will be the easy part. I have inhaled for than enough aluminum dust today.
But the hard part is done. Everything should be bolt on from here on out. And that includes the rest of the mods. Even the subframe, I intend on mocking the brackets up on cardboard and taking it to the shop and have them make it in aluminum. Can't wait to be done though. It's depressing to have such a warm day out but have no bike.
Picked up my GSXR front wheel today as well.