here is the rubber chair leg things I used for my sync tool

sync tool. I removed the hose that connects to the carbs for storage because I didnt want any moisture going up into it...

iv got mirriors now!




I dont know if you can see where the exhaust melted threw the lower.

I need to make an add on for the control swap..
people seem to think that have to go and cut and solder wires together to do them...this is wrong
all you need as a very tiny flat-head screw driver and there are pins that hold the wire heads inside of the connecters.
here is a pic of all the wires romoved from the left hand control side...I did the same with the r6 controls and just plugged them straight into the fzr plug so it plugs right in

my control is off a 01 r6 I think

some stay pics

mount

the bottom set is to far forward which is causing the upper to point more up...Ill be making a new bracket to fix this

ravon

blue

guy I bought the r6 headers from also had a wall of batteries from all the bikes he has torn down...cant ship acid...so he gave me one of the maitnence free batteries...
it doesnt work on the fizz though...if you hit the start button, the starter solinoid just clicks super fast and nothing else....sucks...there all 12v...i dont get why it doesnt work

next will be to install the yzf master with r1 res.

the headers are at the shop, so no pics for now...