April 24th 2009.
OK, so my week went like this:
Monday - Sorry Steve we need to pull sponsorship for your next race at least. The company needs to tighten its belt for a few months.
Friday - So Steve how do you feel about two to three weeks off without pay. We really need to tighten up and we have nothing for you to do after this next oven is finished.
Now you have plenty of time to build your bike though right?
f*ck it, thats life. moving on.....
So Uli and I got started working on the subframe installed the 600 yzfEngine, we used the original fuel tank, cut it open and took 3cm of height out of it so its shorter now and I can use the carbon fiber cover now.
It looked like total shit filled rust inside. So we sand blasted it first. Uli will have it done tomorrow.
Next we fit up the 636 radiator and the Hindle exhaust then fit in the body work I already modified. Get the brackets and tach dash made. I need to get this done asap so I can get the body work painted up. Given the fact I lost my sponsorship I think I will do it up a little different than the sponsors colors. but who knows. Thats for later next week to figure out.
Here are a few pics for ya

Uli weldng up the Subframe - She wil be mounted on the 3EN Frame

We took the black colored 400cc engine out and replaced it with Spyders built 600cc YZF engine.

Side view with someparts fit up. The 400 exhaust bolted right up so we used it to get an idea how the whole thing will lay out. Monday we will cut and install the Hindle... it needs a small mod to work.

Cut lines on the original 3EN fuel tank

crap in side the cut open tank. its shinny clean now after sand blasting it. .72mm thick on the shell thickness.

Uli "Signals" me that he is done for the night.

Pretty much where we are at right now except we have the fuel tank out, cut blasted and getting welded up tomorrow.